After this, a rear stiffener must be fabricated from raw angle aluminium. This will attach from the back side on the brackets.
Each of these requires several nutplates attached which will allow the use of screws from the top side the the floor boards are installed.
After about 4 hours of work, here is what I have ended up with.
I have to make a run to Harbor Freight to buy an HVLP sprayer and order some primer. Until then, these parts will go into the "almost finished" pile.
Tomorrow, on the the control sticks.
No comments:
Post a Comment