So, the next bulkhead is the F706. This is located behind the baggage compartment and is the main support for the elevator push rod bell-crank. There is some fabrication here as well. The angle aluminum needs to be cut out and shaped.
Then all the pieces are put together, match drilled and fitted.
Good times.
No comments:
Post a Comment