First to drill the actuator bars. Holes to accept AN3 bolts.
Then the plastic mounting block is prepped.
Mounting pieces fabricated per plans.
Fit the flap motor and ram to the assembly and drill.
Fit the assembly in the plane between the seat locations and test run.
No comments:
Post a Comment