Sunday, November 19, 2017

Landing Gear Attach Points

Now on to the landing gear attach points. First started by installing the gear leg into the assembly. There is a hole at the top which takes a AN4 bolt to hold the gear leg in. This hole must be drilled to match the leg.





Once that is complete, the assembly can be installed in the fuselage. This may look easy, but there was 4 hours of filing, sanding and drilling to make this piece fit. I was only able to finish one of these today.

I still need to drill to the side of the fuse. 



No comments:

Post a Comment